West Valley City, Utah

MOVING
EARTH.
BUILDING
FUTURES.

Trusted heavy haul specialists — dump trucks, side dumps, belly dumps, flatbeds, and hydrovac services for construction and infrastructure projects across the state.

Fully Insured
DOT Compliant
99%+ On-Time
Wasatch Front
Mon – Sat
Saturdays Included
5
Equipment Types
99%+
On-Time Rate
Mon–Sat
Saturdays Included

Our Fleet

OUR SERVICES

Trucks across 5 equipment types — serving the Wasatch Front from Salt Lake City to Ogden, Provo, Lehi, and all of Utah.

DUMP TRUCK HAULING

Ideal for earthmoving, aggregate delivery, fill dirt, gravel, and construction debris removal across the Wasatch Front.

18–20 Ton  ·  $115/hr
Earthmoving Aggregate Fill Dirt Gravel

SEMI W/ SIDE DUMP

High-volume aggregate hauling with precision lateral discharge along trenches, roadways, and embankments.

33–36 Ton  ·  $135/hr
High Volume Road Base Embankments

DOUBLE BELLY DUMP

Maximum payload for high-volume bulk material transport. The most cost-efficient option per ton on large earthwork and infrastructure jobs.

40 Ton  ·  $140/hr
Max Payload 40 Tons Bulk Materials

FLATBED TRAILERS

Flatbed trucks for heavy equipment, structural steel, pipe, lumber, and machinery. Certified load securement on every haul throughout Utah.

$135/hr
Equipment Steel & Pipe Machinery

HYDROVAC EXCAVATION

Hydrovac trucks with 1–2 operators for precision non-destructive excavation near live utilities. Port-to-port billing, 2-hour minimum. $260/hr standard; $300/hr after 8 hrs/day.

1–2 Operators  ·  $260/hr
Utility Locating Slot Trenching Daylighting Potholing

Transparent Pricing

HAULING RATES

Straightforward rates out of West Valley City, UT — no hidden fees. 30-minute travel minimum on all equipment. Net-30 payment terms.  Call Dave for volume pricing (10+ loads/day).

Service Hourly Rate Travel Min
Dump Truck Hauling
Standard belly dump
$115 /hr 30 min
Semi w/ Side Dump
High-volume aggregate
$135 /hr 30 min
Flatbed Trailer
Equipment & oversized loads
$135 /hr 30 min
Double Belly Dump
Max payload configuration
$140 /hr 30 min
HydroVac Excavation Specialty
Port-to-port · 2 hr minimum
$260 /hr
$300/hr after 8 hrs
30 min

ADDITIONAL FEES & TERMS

Fuel Surcharge

+$1.00/hr per $0.10 above $4.20/gal diesel. Applies to all equipment.

HydroVac Disposition

$200 flat fee for material disposal. Supply water: $75 additional.

Volume Discount

10+ loads/day qualifies for volume pricing. Call Dave for details.

Payment Terms

Net-30. COI available upon request. All equipment fully insured.

Insurance Coverage

Cargo $1M · Auto Liability $1M · General Aggregate $2M.

Driver Standards

2+ yrs verifiable experience · FMCSA-compliant · Fluent English · No major violations.

Need a project-specific quote?

Request a Custom Quote

Get In Touch

LET'S MOVE
SOMETHING.

Dave is ready to discuss your project and provide a fast, accurate quote. Reach out by phone, email, or use the form.

Call or Text Dave
(801) 388-5575
Email Dave
davep@haulprotruckin.com
Based In
West Valley City, UT 84120
Wasatch Front — SLC, Ogden, Provo, Lehi & all of Utah

BUSINESS HOURS

Monday – Friday Available Saturday Available Sunday Closed

Mon–Sat availability. Call Dave at (801) 388-5575 to schedule or get a same-day quote.

GET A FREE QUOTE

Fill out the form and Dave will respond within 24 hours with a detailed quote for your project.

Prefer to call?  (801) 388-5575